访问量:   最后更新时间:--

周勇

博士生导师
硕士生导师
教师姓名:周勇
教师英文名称:zhouyong
教师拼音名称:zhouyong
电子邮箱:
所在单位:管理学院
学历:研究生(博士)毕业
性别:男
联系方式:zhouyong@xauat.edu.cn
学位:博士学位
职称:副教授
在职信息:在职
其他任职:绿色建筑全国重点实验室太阳能建筑与环境骨干成员
毕业院校:西安建筑科技大学
所属院系:管理学院
学科:管理科学与工程    
其他联系方式

邮箱:

论文成果
A new capacity design method for PV-ASHP system based on energy flowmechanism and energy supply-demand balance
发布时间:2026-04-07    点击次数:

发表刊物:Renewable Energy

关键字:PV-ASHP systemEquipment capacityNew design methodEnergy flow mechanismEnergy supply-demand balanceImprove performance and economy

摘要:Photovoltaic driven air source heat pump (PV-ASHP) system provides a solution for the simultaneous supply of electricity and heat for buildings in remote areas. However, due to the lack of simple and accurate capacity design methods for PV-ASHP system engineering, the capacity of various types of equipment is often inappropriate, which further reduces the performance and economy of the system. In this study, the respective energy flow and balance relationships of electricity and heat in the system are analyzed by establishing different energy network models of three typical operating conditions, and some new key capacity design principles are derived. Then, a new capacity design method based on energy flow mechanism and dynamic supply-demand balance in the PV-ASHP system is proposed, and the corresponding design process is given. Compared with the traditional design method, the maximum reduction rate of equipment capacity under the new design method is 68.0 %; the investment cost, operation cost and electricity abandonment rate decreased from 118,671.4 CNY, 16,880.9 CNY and 76.1 % to 83,459.0 CNY, 9611.5 CNY and 74.7 % respectively; meanwhile, the renewable energy fraction increased from 57.7 % to 65.1 %. The new design method provides a valuable reference for the accurate capacity design of PV-ASHP system engineering.

合写作者:袁旺秋

第一作者:曲磊,周勇,刘艳峰,樊建华

论文类型:期刊论文

通讯作者:王登甲

卷号:239

是否译文:

发表时间:2025-01-01